LOISOS + UBBELOHDE : Architecture . Energy  
     
  int designdotlight designdotlight sculptdotBuilding Performancedotr+ddotfirmdotcontact  
   



visualizationline

 
 
   

Gap Corporate Campus 901 Cherry

The complexities of designing the high performance facade for the State Compensation Insurance Fund ranged from coordination of disciplines (architectural, structural, mechanical, curtainwall, daylighting, electrical lighting and space planning) to cost and value considerations in value engineering and specifications. While the design and evaluation of a curtainwall system in relation to single performance critera (daylight, energy use, cost, lateral loads, etc.) is not necessarily difficult, resolving all performance criteria within the design process and timeframe posed significant challenges. To help resolve this complexity Loisos + Ubbelohde performed detailed comfort prediction calculations.

More Detail

Previous Project | Next Project

 
ARCHITECT
Hellmuth, Obata & Kassabaum

LOCATION
San Francisco, CA

CURRENT STATUS
Unbuilt

Advanced thermal modeling was used to predict thermal bridging through the curtain wall.